设计采用阶段矿房采矿法,溜矿井加平硐运输,有轨运输共计3200m,年处理矿石30万t/a,年生产黄金2.4t。
Geerke Gold Mining Design
Adopting stage mining, sneak and adit transportation,3200 meter of rail conveying, its capacity is 0.3 Mt/a, and the production of gold is 2.4 t/a.
上一篇:湖北鸿昇矿业有限公司
下一篇:技术、信用撑起海外市场一片天